The project that doesn’t lie.

For UK contractors and subcontractors: your programme and your site diary in one. Plan the work, log the day against the activity it belongs to, and the record writes itself.

The check is free and needs no account: drop in your Asta, P6 or MS Project file and the file never leaves your computer. Built by a planner on live fit-out jobs in London, not by a software house.

Worked example

How it works

Your programme and your diary don’t agree.

Biltevo is both of them — the plan you agreed and the days as they actually went, in the same place, on the same dates, with nothing to reconcile at month end.

01 · Build

Draw the plan

Put the jobs on a canvas and join them up in the order they happen. The dates, the critical path and the knock-on effects come out of the logic, not out of a spreadsheet.

Harbour Street — refurbishmentCanvas
Strip-out — floors 1–28d7 Sep – 16 Sep
SFA1
Partitions — floor 110d17 Sep – 30 Sep
PFA1
M&E first fix — floor 110d17 Sep – 30 Sep
MFFA1

02 · Plan

See it as a Gantt

The same plan as bars on a timeline. Import one from Asta, P6 or MS Project and the links come across with it. You do not keep the old tool running beside this one.

Harbour Street — refurbishmentPlan
Activity7 Sep21 Sep5 Oct19 Oct2 Nov16 Nov30 Nov14 Dec
Strip-out — floors 1–28d
Partitions — floor 110d
M&E first fix — floor 110d
Windows — floors 1–212d
Plastering — floor 18d
Decoration — floor 110d
Snagging5d
HandoverTue 17 Nov

03 · Deliver

Log the day from site

Three taps on a phone, against the activity it belongs to. Not a diary sitting next to the programme. The same programme, so a blocked morning moves the finish date.

Harbour Street — refurbishmentDeliver
TodayTHU 17 SEP
Partitions — floor 110d · due to start
On trackBlockedDone
File it
Partitions — floor 110d
M&E first fix — floor 110d
Plastering — floor 18d
Handover17 Nov

The day lands on the job it is about. If it costs time, the chain re-runs and the handover date moves with it.

04 · Record

Keep an honest record

Every change carries its date, its cause and whose it is, and cannot be edited after the fact. Nothing is assembled at the end of the month, because it is already written.

Harbour Street — refurbishmentRecord
Partitions10d
M&E first fix10d
Handover19 Nov
LoggedWhat changedWhy, and whoseFinish
9 Sep · 07:58v1Strip-out extended 8d to 10dAsbestos found in the ceiling voidSurvey conditionClient+2d
2 Sep · 14:12v1Baseline accepted8 activities · Harbour Street — refurbishment—no change

05 · Check

Check the plan holds up

Twelve of the fourteen checks in P6's own Check Schedule Report, in plain English: activities with nothing driving them, negative float, durations too long to report against.

Harbour Street — refurbishmentProgramme check
Partitions10d
Plastering8d
Snagging5d
Handover17 Nov

Contract completion is 19 Nov. The programme finishes inside it, with 2 days to spare.

Missing linksevery activity is driven and consumedPass
Negative floatnothing finishes after 19 Nov; 2 days of slack leftPass
High floatnone over 44 daysPass
Harbour Street — refurbishmentCanvas
Strip-out — floors 1–28d7 Sep – 16 Sep
SFA1
Partitions — floor 110d17 Sep – 30 Sep
PFA1
M&E first fix — floor 110d17 Sep – 30 Sep
MFFA1

Harbour Street — refurbishment · launch the demo

Working with other people

Hand a job over.
Get a plan back.

The work you have given to somebody else is one line on your plan and a fortnight of detail on theirs. That detail normally never arrives. It lives in their spreadsheet, and you find out what was in it when it goes wrong.

Send them the line and the dates you have left for it. What comes back sits inside your bar: their steps, their durations, their words, on your programme. If it does not fit the slot, the page says so in days.

BiltevoInbox

Needs you

Receivedtoday · Northfield Interiors

Partitions — floor 1 · from Harbour Street — refurbishment

Access17 Sep
Handover back30 Sep
Their plan12 days · 3 steps
Review and add to a jobLater

It arrives as one card. Who sent it, what it is, and the dates it turns on. Nothing is accepted by looking at it — reviewing is where it joins the job.

Starting from nothing

Describe the job. Correct the programme.

The rest of this page assumes you already have a programme. If you do not, say what the job is in the words you would use on the phone. The first draft comes back built, with the sub-steps you implied but did not type.

What you type
Opens a workspace and builds it from these words.
What comes backDraft
Strip-out — floors 1–210d
— soft strip4d
— M&E strip and make safe6d
Partitions — floor 112d
M&E first fix — floor 114d
Windows — floors 1–28d
Plastering — floor 110d
Decoration — floor 18d
Snagging5d
Handover0d

Linked, dated from the start you gave, and sitting as a draft version with a report of what it assumed. Nothing has touched a live programme.

It will get some of this wrong, and it is meant to be corrected: a draft is a faster starting point than an empty screen, not a substitute for knowing the job. The corrections are the bit only you can do.

Why Biltevo

The plan and the record are the same file.

Everywhere else the programme sits in one tool and the day sits in another, and somebody spends the end of every month deciding which one is right. Here there is nothing to decide.

One line, filed from site

Partitions held 3 daysAccess restriction · Thu 17 Sep, 08:42

Finish wasTue 17 NovFinish nowFri 20 Nov

The day lands on the job.

You log against the activity, not against the date. There is nothing to match up later because nothing was ever apart — the programme and the diary are the same records, read two ways.

A lost morning is a number.

Time lost goes in as working days against the job that lost them. The chain re-runs there and then: float goes, the critical path moves if it moves, the finish date changes. You know what the day cost on the day, not next month.

Nobody is left off it.

You pay for the job, not the heads on it, so the PM, the QSs, the site manager and the subcontractors are all on. Per-seat pricing is what takes the subbies off a licence, and they are the ones who saw what happened.

What it takes off your desk: a programme updated monthly at best, a diary nobody opens until there is an argument, and the week somebody spends putting the story back together afterwards.

Also in here

The rest of the job.

Riverside — phase 2.ppImport

1,284 activities97% matched

ActivityBiltevoThe file
Piling — grid A14 Sep14 Sep—
Steel erection06 Oct06 Oct—
Envelope — east21 Nov17 Nov+4d
Roof covering02 Dec02 Dec—

38 disagree · 31 of them a calendar difference

Check the file you already have.

Import an Asta, P6 or MS Project file and Biltevo re-runs it. Every date and every float compared against what your own tool stored, and the ones that disagree grouped by what caused it.

Four live projectsBoard
Harbour Streeton plan
Mill Lane+9d
Quay Roadon plan
Bridge Yard+15d

Every job on one set of dates.

The board puts your live projects on a single timeline: what moved, what did not, and how far, without opening any of them.

Company calendarWorking time

Mon–Fri8 bank holidays · 253 working days in 2026

Weekends · bank holidays · the Christmas shutdown

Working days, not calendar days.

One working-time calendar: your week, your bank holidays, your shutdowns. Every duration on every programme is counted against it, so nobody argues about whether Christmas was in the ten days.

Harbour Street — refurbishmentTags
DryliningZone A1Level 2
Partitions — floor 110d · 17 Sep – 30 Sep0d float
DRYA1

Trade · area · floor · free text, never a fixed list

Grouped the way the job is.

Tag by trade, by area, by floor, in your words rather than a fixed list, and the programme regroups to match. The same tags colour the bars, so a floor reads at a glance.

Price

Per project, not per seat.

Fourteen days free, no card. Drop a programme in, see what is wrong with it, fix it and export it. If you stop there you keep everything you made and can still export it. you just cannot change it.

£39a month

One planner, their own programmes. Canvas, Gantt, critical path, import and export.

£199a project, a month

Everyone on that job, every mode: the PM, the QSs, the site manager, and the subcontractors you invite.

£1,250a month

Up to 10 live projects on one invoice, cheaper than per-project from seven jobs on. £2,150 to 25. More than that, or a group of companies, tell us about the estate and we will price it.

£199 for the job, whoever is on it. The PM, two QSs, the site manager and four subcontractors: eight people, still £199. A per-seat planning tool at the £30–40 a head they charge puts the same eight at £240 to £320 a month for one job, and an Asta seat alone runs to four figures a year. That is the arithmetic that takes the subcontractors off the licence, and they are the ones who know what happened.

Questions

Asked before anything else.

What is Biltevo?

Biltevo is project planning software that keeps the programme and the daily site record as one set of records rather than two. It runs a real critical path: a forward and backward pass with total float on every activity. A day logged from site attaches to the activity it belongs to, so time lost recalculates the completion date straight away. It is used mainly on UK construction projects.

How much does Biltevo cost?

£39 a month for one planner and their own programmes. £199 a month per project with everyone on that job included. £1,250 a month for up to 10 live projects on one invoice, £2,150 for up to 25; larger estates are priced on request. Pricing is per project, not per seat, so the project manager, the quantity surveyors, the site manager and the subcontractors are all included at no extra cost. Every plan starts with fourteen days free and no card.

Can I import a programme from Asta Powerproject, Primavera P6 or Microsoft Project?

Yes. Biltevo imports Asta Powerproject, Primavera P6 (XER) and Microsoft Project (XML) files, bringing across the activities, the durations and the links. It then re-runs the programme through its own engine and reports every date and every float that disagrees with what the source file stored, grouped by what caused the difference. Programmes export back out to XER, MSPDI, CSV and spreadsheet formats.

Does Biltevo do critical path analysis?

Yes. A full CPM forward and backward pass, total float on every activity, the critical path, and a completion date measured against the contract date. It also runs twelve of the fourteen checks in P6's own Check Schedule Report and reports them in plain English: activities with nothing driving them, negative float, how much of the programme is held together by overlaps rather than finish-to-start logic, and durations longer than anyone can honestly report against. The two it does not run both need a baseline inside the file.

How is Biltevo different from a lookahead or field-scheduling tool?

Most of them run the week downstream of a master programme that stays in Primavera P6 or Asta Powerproject, and the site diary is usually a separate product priced separately. Biltevo holds the master programme itself, so a day logged from site moves the completion date rather than being reported against a lookahead, and the plan and the record are the same object with nothing to reconcile between them.

Can subcontractors use it?

Yes, at no extra cost, because the price is for the project rather than for each person on it. A main contractor can send a subcontractor a package with the dates set aside for it; the subcontractor plans their own steps and those come back inside the main programme as part of it, not as a separate document to be read and re-typed.

Does Biltevo work on a phone?

Logging the day works in a phone browser: three taps, filed against the activity it belongs to. There is no native app to install. Building the plan and reading the forensic record are designed for a desktop screen.

Start

See it on a programme.

The demo opens on Harbour Street — refurbishment with the plan, the log and the record already in it. Drag a bar and watch the completion date move. Or put your own programme in and see what it says — the file stays on your computer. Nothing to install, nothing to sign.