What is Biltevo?
Biltevo is project planning software that keeps the programme and the daily site record as one set of records rather than two. It runs a real critical path — a forward and backward pass with total float on every activity — and a day logged from site attaches to the activity it belongs to, so time lost recalculates the completion date straight away. It is used mainly on UK construction projects.
How much does Biltevo cost?
£39 a month for one project and £199 a month for ten live projects. Unlimited projects with SSO and your own retention policy is priced on request — the shape of an estate that size decides the number. Pricing is per project, not per seat, so the project manager, the quantity surveyors, the site manager and the subcontractors are all included at no extra cost. Billing is not connected yet, so early projects run free until it is.
Can I import a programme from Asta Powerproject, Primavera P6 or Microsoft Project?
Yes. Biltevo imports Asta Powerproject, Primavera P6 (XER) and Microsoft Project (XML) files, bringing across the activities, the durations and the links. It then re-runs the programme through its own engine and reports every date and every float that disagrees with what the source file stored, grouped by what caused the difference. Programmes export back out to XER, MSPDI, CSV and spreadsheet formats.
Does Biltevo do critical path analysis?
Yes. A full CPM forward and backward pass, total float on every activity, the critical path, and a completion date measured against the contract date. It also runs nine of the fourteen DCMA schedule assessment checks and reports them in plain English — activities with nothing driving them, negative float, and durations longer than anyone can honestly report against.
How is Biltevo different from Aphex or other lookahead tools?
Field-scheduling tools such as Aphex run the week downstream of a master programme that stays in Primavera P6 or Asta Powerproject, and their site diary is a separate product priced separately. Biltevo holds the master programme itself, so a day logged from site moves the completion date rather than being reported against a lookahead, and the plan and the record are the same object with nothing to reconcile between them.
Can subcontractors use it?
Yes, at no extra cost, because the price is for the project rather than for each person on it. A main contractor can send a subcontractor a package with the dates set aside for it; the subcontractor plans their own steps and those come back inside the main programme as part of it, not as a separate document to be read and re-typed.
Does Biltevo work on a phone?
Logging the day works in a phone browser — three taps, filed against the activity it belongs to. There is no native app to install. Building the plan and reading the forensic record are designed for a desktop screen.